Willamette River Bridge

Bridge Masters, Inc. hired as the General Contractor to relocate Qwest and Comcast Utilities on the Willamette River Bridge.  Construction to begin early May 2009.  A total of 5,300 lf of 4" Fiberglass Conduit to be installed on the bridge.  Complete engineering and fabrication of the conduit hangers and concrete coring.

ODOT is restoring a historical bridge and needed the existing utilities moved to their current locations so crews could access the needed areas for proper restoration and repairs.





  2010 Bridgemasters Inc. Home of the BridgeWalker